Through my years at WDI, I worked mostly for Ride Engineering but was loaned out to Imaging & Effects, Show Production, Plastics and R & D as a nomad carpenter. I was trusted to work with little to no supervision. I've listed the highlights below, but contributed to dozens of projects not listed. I was also loaned out to the Electronics lab to assemble motherboards and other installations.
Toy Story Funhouse – installation carpenter next door to the El Capitan
Hunchback of Notre Dame – fabrication of scaled down replica of Notre Dame Catherdral for a mall tour
Donald's Boat – fabrication crew
Mission Space – fabrication of full scale ride vehicle prototype, ridden by Eisner
Ride The Comix – full scale fiberglass molds for space sled vehicles
ESPN Store (Chicago) – fabrication of large window displays for storefront. Includes fabrication of crates for transport
Fly Saucers (Tokyo Disney Seas) – Fabrication of full scale 50's style sci-fi two seater ride vehicle protoype
Rocket Bike Ride (TDS) – Ride vehicle and test track at Golden Oaks Ranch
Winnie The Pooh Ride – fabrication of large test floor embedded with electronic sensors for FRV
Finding Nemo – Built large scale pool to test water bubble fixtures. Also worked on the queue line mock-up for Imaging & Effects
Thunder Mountain & A Bugs Life – existing ride vehicles modified for ADA compliance
Space Mountain – Removal of original ride vehicles from chassis to be carted up and shipped. I also replaced temporary Imaging & Effects compotents to 60 stations located throughout the ride
Splash Mountain – part of a two year effort to replace existing vehicles.
Tower Of Terror – fabrication of full scale ride vehicle for audio, lighting and egress testing
Toy Story (EuroDisney) – fabrication of production show consoles
Soaring Over California – fabrication of two story scaffolding and test deck for projector
Luigi's Tire Ride – fabrication of bumper test fixtures and testing regime
Pirates of The Caribbean (Shanghai) – modification and expansion of existing boat to create more seating
Jungle Cruise Boat (Shanghai) – modifications of existing vehicle as per engineers and designers
Simulator Buildings – involved extensively in relocation to the new simulator building from disassembling the old building and reassembly of all components in new building at Bonus Bilt
Flying Dragon – fabrication crew of ride vehicle and pit crew member for on site presentation